Garner Heating & Air Conditioning
- Installed Carrier gas system. Installed 2 Ecobee thermostats
- Installed new supply and return plenums. Installed zone board and two 14” zone dampers.
- Replaced secondary drain pan. Rebuilt and insulated primary drain line. Installed SS2 and SS3 safety float switches. Cleared
and verified drain operation. - Replaced disconnect and whip at outdoor condenser.
- Pressure tested and pulled a vacuum on the copper line set. Weighed in charge to meet manufacturers specifications.
System operational. - Cost: $15,488.28